Summer maintenance works

Starting on Monday 12 June, maintenance works will take place in and around FASoS buildings. The works are expected to last over the summer and may cause some noise nuisance. For an overview of the works to be carried out, please read below.

  • In GG80-82 the toilets in 1.011a, 1.012b, 2.011a, 2.012d, 3.011a and 3.012d will be renovated (these toilets are all situated in the old part of GG80-82).
  • The facade above the gate of GG90-92 will be repaired.
  • The outside woodwork of the Turnzaal will be painted.
  • The back of GG86 (entrance common room/ Bandito) will be painted on the outside and some small repair works will be done on window frames.
  • In GG76 a storage room will be splitted in two to create two separate rooms. One for storage and one as a nursing room/restroom.

Please contact Vincent Cordewener if you have any questions.

Submit your comment

Please enter your name

Your name is required

Please enter a valid email address

An email address is required

Please enter your message

FASoS Weekly © 2019 All Rights Reserved

Designed by WPSHOWER

Powered by WordPress