Summer maintenance works

Starting on Monday 6 June, maintenance works will take place in and around FASoS buildings. The works are expected to last over the summer and may cause a noise nuisance. For an overview of the works to be carried out, please read below.

  • In GG90-92 the toilets in D1.04, D1.06, B1.02 and E1.04 will be renovated.
  • In GG86 the toilet near the common room E0.011 will be renovated.
  • In GG80-82 the toilets in -1.036, 0.031, 0.004, 1.011/ 1.012, 1.031, 2.011/ 2.012, 2.031 and 3.011/ 3.012 will be renovated as well as the ceilings in the hallways 0.020, 1.000, 2.000.
  • In GG76 the toilet on the ground floor 0.05 will be renovated and the window frames (outside) will be repainted.

Please contact Vincent Cordewener if you have any questions.

Submit your comment

Please enter your name

Your name is required

Please enter a valid email address

An email address is required

Please enter your message

FASoS Weekly © 2024 All Rights Reserved

Designed by WPSHOWER

Powered by WordPress