Maintenance in and around FASoS buildings from 14-16 February

Please note that from Wednesday 14 February until Friday 16 February several maintenance works will take place in and around the FASoS buildings:

• GG76; in the boiler room on the first floor a door will be replaced for fire safety regulations. Noise nuisance will be kept to a minimum but from time to time some drilling and breaking can be heard.
• GG80-82; the wooden stairs in the back building will be repainted. Some noise is expected from sanding machines. Signs will be put up to show what direction to take to go through the building.
• GG80-82; in the courtyard between the front and back building a new sewage pipe will be installed. Some concrete has to be cut out and will cause noise nuisance. Works are planned to start as early as possible (7:00am) and will take around 2 hours to finish.
• GG90-92; in the courtyard lightning rods will be repaired. Noise from drilling is expected for longer periods during the day.

Please contact Vincent Cordewener if you have any questions.

Submit your comment

Please enter your name

Your name is required

Please enter a valid email address

An email address is required

Please enter your message

FASoS Weekly © 2024 All Rights Reserved

Designed by WPSHOWER

Powered by WordPress